Compliance - Archives and Special Collections Management - Metro Archives and Special Collections Records - Diagnostic and Feasibility Study of Smith & Bybee Lakes

DOC22/1113

This is Jim Morgan's work via the Clean Lakes grant from the DEQ summarizing diagnostic work done in early 1990s and adding water quality sampling for 1992 and 1993 and a fish survey done in 1992. Feasibility studies included evaluation of flow-through from Columbia River to Smith Lake and water quality impacts to the wetlands and North Slough if they were reconnected. Recommendations included: new water control structure to open wetlands to North Slough while allowing retention of water as needed; develop a way to augment flow into the wetlands; remove sunken barge in North Slough; and develop a water management and monitoring plan. This record is part of the Smith and Bybee Wetlands Natural Area Historical Records Collection.

PDF