Records - allRelated:2735 (98-2674) - 30+ records

Title (Free Text Part) Record Number Date Created / Date Adopted
PDF
98-2674: For the Purpose of Adopting the Locally Preferred Strategy (LPS) For South/North Light Rail Project. 98-2674 07/23/1998
pdf
03-3303: For the Purpose of Amending the Locally Preferred Strategy For the South/North Corridor Project to Define a Two-Phased Major Transit Investment Strategy For the South Corridor, With the I-205 Light Rail Transit Project as the Phase 1 Locally Preferred Alternative Followed By the Milwaukie Light Rail Transit Project in Phase 2 03-3303 04/17/2003
pdf
03-1007A: For the Purpose of Amending the Regional Transportation Plan to Include the Two Phases of the South Corridor Study Consisting of the I-205 Light Rail Transit (LRT) Project From Gateway to Clackamas Regional Center With Portland Transit Mall LRT, Expansion of LRT From Downtown Portland to Milwaukie and Deletion of Plans to Extend LRT From Milwaukie to Clackamas Regional Center 03-1007A 06/19/2003
pdf
04-3403: For the Purpose of Finalizing the Decision to Add the Portland Mall Alignment to the Locally Preferred Alternative For Phase I of the South Corridor Light Rail Project. 04-3403 01/15/2004
pdf
04-3434: For the Purpose of Endorsing the Final Conceptual Design Report For the Portland Mall Segment of the South Corridor Project. 04-3434 05/20/2004
PDF
08-3959: For the Purpose of Approving the 2008 Portland-Milwaukie Light Rail Project Locally Preferred Alternative and Finding Consistency With the Metro 2035 Regional Transportation Plan. 08-3959 07/24/2008