PDF
|
95-2243: For the Purpose of Studying the South/North Downtown Portland Alignment Options and an Amended North Terminus Option in the DEIS, Concurring With the South/North Steering Group's Selection of Design Options, and Adopting the Major Investment Study Final Report
|
95-2243
|
12/21/1995 |
PDF
|
97-2505A: For the Purpose of Adopting Cost-Cutting Amendments to the South/North Light Rail Alternatives and Design Options to Be Studied Further in the Project Draft Environmental Impact Statement.
|
97-2505A
|
05/22/1997 |
PDF
|
98-2674: For the Purpose of Adopting the Locally Preferred Strategy (LPS) For South/North Light Rail Project.
|
98-2674
|
07/23/1998 |
PDF
|
Council Agenda
|
MEET22/172
|
12/22/1994 |
PDF
|
Joint Policy Advisory Committee on Transportation (JPACT) Agenda
|
MEET10/659
|
12/08/1994 |
PDF
|
Joint Policy Advisory Committee on Transportation (JPACT) Minutes
|
MEET10/660
|
12/08/1994 |
PDF
|
Joint Policy Advisory Committee on Transportation (JPACT) Packet
|
MEET10/661-01
|
12/08/1994 |
PDF
|
Joint Policy Advisory Committee on Transportation (JPACT) Packet
|
MEET10/661-02
|
12/08/1994 |
PDF
|
Council Minutes
|
MEET20/626
|
12/22/1994 |
PDF
|
94-1989: For the Purpose of Determining the South/North Light Rail Transit Alternatives to Advance Into the Tier II Draft Environmental Impact Statement For Further Study.
|
94-1989
|
12/22/1994 |